Client Type: Municipality
Services:
Project: Rehabilitation of Wet Wells at Pump Station 136, 137 and Headworks Structure at Crescent Beach Wastewater Treatment Plant
Surface Preparation and Coating Application
Surface prep per SSPC-SP13 “surface prep for concrete” using 5,000-6,000 PSI rotary nozzle pressure washer
Primed using Sherwin-Williams DuraPlate 235 Epoxy Primer (3-5 mils DFT)
Blasted and coated exposed rebar with rebar primer
Rebuilt structures to the original plane using MSM mortar (1/2 – 4” thick)
Applied minimum of 125 mils of Sherwin-Williams SherFlex Urethane Flexible Lining System
Completed: February 2009
Testimonial from post-job completion survey:
“I would rate you EXCELLENT on your response time and working with your team on site. We would like you to bid on any other projects that we will have – we were very satisfied.”
– Loy Williford, Buyer for the City of North Myrtle Beach